No. | Project/contract name | Location | Year | Type of work | Client |
79. | HPP Bogatići Nova, 9,98 MW |
BiH Rep. Srpska, Municipaltity Trnovo |
2018 | Equipment factory and site testing and acceptance - consulting and supervision | Elektrodistribucija Pale, Pale, Rep. Srpska, BiH |
78. | SHPP Medoš 4,68 MW |
BiH Rep. Srpska, Municipaltity Zvornik |
2017/2018 | Design supervising during construction | MHE Medoš ONE, Banja Luka |
77. | MHE Podgrab 232 KW |
BiH Rep. Srpska Municipaltity Pale |
2016 | Final design | MP-Farm, Pale, Rep. Srpska, BiH |
76. | HE Bogatići Nova, 9,98 MW |
BiH Rep. Srpska Municipaltity Trnovo |
2016 | Basic design, Feasibility Study Production of Tender documentatioin, Final design |
Elektrodistribucija Pale, Pale, Rep. Srpska, BiH |
75. | MHE Medoš, 4,68 MW |
BiH Rep. Srpska Municipaltity Zvornik |
2016 | Basic design, Feasibility Study Production of Tender documentatioin, Final design |
MHE Medoš ONE, Banja Luka |
74. | MHE Usora 1, 1,65 MW MHE Usora 2, 603 kW |
BiH Rep. Srpska Municipaltity Teslić |
2015 | General design and Prefeasibilty studies |
Kalmel d.o.o., Banja Luka |
73. | MHE Govza 1, 4,88 MW |
BiH Rep. Srpska Municipaltity Foča |
2015 | Technical control of Final design | Elektros d.o.o., Banja Luka |
72. | MHE Babino polje, 2,92 MW MHE Jara, 6,53 MW |
Montenegro Municipaltity Plav | 2015 | Consulting services during Project realisation | MottMcDonald, Serbia |
71. | MHE Medoš, 4,68 MW |
BiH Rep. Srpska Municipaltity Zvornik |
2015 | Basic design and production of Tender documentation | MHE Medoš ONE, Banja Luka |
70. | MHE Mesići, 4,9 MW |
BiH Rep. Srpska Municipaltity Rogatica |
2014 - 2015 | Consulting services during Project realisation | Elektrodistribucija Pale |
69. | MHE Mesići 2, 4,9 MW |
BiH Rep. Srpska Municipaltity Rogatica |
2014 | Revision of Final design | Elektrodistribucija Pale |
68. | MHE Mesići, 3,2 MW |
BiH Rep. Srpska Municipaltity Rogatica |
2014 | Conceptual technical solution of revitalisation | Elektrodistribucija Pale |
67. | SHPP Sutjeska 2a, 4,95 MW SHPP Sutjeska 2b, 2,62 MW SHPP Jabušnica 1, 1,86 MW |
BiH Rep. Srpska Municipaltity Foča |
2013 - 2014 | Revision of Revision of |
Drina Hydro Energy Ugljevik |
66. | SHPP Hrčavka 1, 350 kW SHPP Hrčavka 2, 3,7 MW SHPP Hrčavka 3, 900 kW |
BiH Rep. Srpska Municipaltity Foča |
2013 - 2014 | Revision of Revision of |
Drina Hydro Energy Ugljevik |
65. | sHPP MRAMORJE 10 MW |
SERBIA Priboj | 2013 | Basic design | MHE Mramorje Belgrade |
64. | sHPP PRIBOJ 10 MW |
SERBIA Priboj | 2012 | Revision of General design | SECI Energia SpA Italy |
63. | sHPP Vladići 1 800 kW |
SERBIA Raška | 2012 | Revision of Final design | SECI Energia SpA Italy |
62. | HPP Medjuvršje 7 MW |
SERBIA Čačak | 2011 | Revision of Final design for additional aggregate | EPS HPP Bajina Bašta |
61. | sHPP Lisine 2 | SERBIA Despotovac | 2010 | Final Design | Resavske elektrane Despotovac |
60. | sHPP Sumrakovac | SERBIA Boljevac | 2010 | General Design | STEP Subotica |
59. | HPP Ustikolina 3 x 21 MW |
B&H Goražde | 2010 | Basic design For Hydro-mechanical equipment | EP B&H Sarajevo |
58. | HPP Bajina Bašta 4 x 90 MW |
SERBIA Bajna Bašta | 2009 | Revision of Design "Replacing of 15.65 kV S/S equipment" | EPS HPP Bajina Bašta |
57. | HPP Bajina Bašta 4 x 90 MW |
SERBIA Bajna Bašta | 2009 | Revision of Design "Operation control of segment shutters" | EPS HPP Bajina Bašta |
56. | SHPP B-3 2 x 8,5 MW |
B&H Republic of Srpska FOČA | 2007 - 2009 | Revizion of complete project dokumentation and consulting | EPRS Elektrodistribucija Pale |
55. | SHPP B-2a 3 x 2,1 MW |
B&H Republic of SrpskFoča | 2007 - 2009 | Revizion of complete project dokumentation and consulting | EPRS Elektrodistribucija Pale |
54. | SHPP B-1 3 x 3,73 MW |
B&H Republic of Srpsk Foča | 2007 - 2009 | Revizion of complete project dokumentation and consulting | EPRS Elektrodistribucija Pale |
53. | SHPP J-1 2 x 2,1 MW |
B&H Republic of Srpsk Čajniče | 2007 - 2009 | Revizion of complete project dokumentation and consulting | EPRS Elektrodistribucija Pale |
52. | HPP Bogatići 2 x 4,1 MW |
B&H Republic of Srpska TRNOVO | 2008 | Revitalization and modernization study | EPRS Elektrodistribucija Pale |
51. | HPP Trebinje I 2 x 54,5 MW, 1 x 60 MW |
B&H Republic of Srpska TREBINJE | 2006 - 2009 | Supervision of revitalization of main equipment of HPP Trebinje I | EPRS HE Trebinje I |
50. | Tivat – Kotor DV 110 kV |
MONTENEGRO KOTOR | 2007 | Creation of tender documentation for 110 kV OHTL Tivat – Kotor | EPCG „Elektroprenos“,Podgorica |
49. | RHPP Bajina Bašta 2 x 300 MW |
SERBIA Bajina Bašta | 2007 | Revision of main design documentation of installation od aditional CBs in 220 kV S/S | EPS RHE Bajina Bašta |
48. | HPP Bajina Bašta 4 x 90 MW |
SERBIA Bajina Bašta | 2007 | Revision of design documentation self supplying system | EPRS HE Trebinje I |
47. | HPP Bajina Bašta 4 x 90 MW |
SERBIA Bajina Bašta | 2007 | Revision of main design documentation replacing of CB 220 kV at field H3 and H4 | EPS HE Bajina Bašta |
46. | S/S 110 kV | SERBIA Obrenovac | 2006 | Technical acceptance | EPS TENT Obrenovac |
45. | Transmition line 330 kV |
FR Nigerija Abuja | 2006 | Subconsalting | DECON Germany |
44. | HPP Višegrad 3 X 105 MW |
B&H VIŠEGRAD | 2004 | Reliability study for GIS 400 kV | EPRS HE Višegrad |
43. | HPP Krupa 2 x 21,2 MVA HPP Banja Luka - Niska 3 x 14 MVA GIS 110 kV 110 kV |
B&H Republic of Srpska Banja Luka | 2003 - 2005 | Consulting | EPRS |
42. | Reconstruction of transmission lines in B&H 110/220/400 kV |
B&H | 2003 - 2005 | Subconsalting | LAHMEYER GERMANY |
41. | Equipment protection for S/S | B&H | 2003 | Testing and settings of protection equipment | Elektrodistribucija Krajina |
40. | HPP Višegrad Equipment protection for HPP | B&H Višegrad | 2003 | Testing and settings of protection equipment of generator | EPRS HPP Višegrad |
39. | TPP Ugljevik Electrostatic filters | B&H Ugljevik | 2003 | Feasibility study | EPRS TPP Ugljevik |
38. | ED Niš Equipment MV | Serbia Elektrodistribucija Niš | 2003 | Delivery and erection of equipment | EPS ED NIŠ |
37. | HPP Višegrad
3 x 115 MVA generator protection |
B&H Republic of Srpska Višegrad | 2002 | Testing and settings of protection equipment of generator | EPRS HPP VIŠEGRAD |
36. | Distribution substations 20(10) 0.4 kV |
Serbia | 2002 | Delivery and mounting distribution equipment | EPS Direkcija za distribuciju |
35. | HPP Trebinje I reconstruction auxiliary consumption 0,4 kV 2 x 60 MVA + 70 MVA |
B&H TREBINJE | 2002 | Design, mounting and testing | EPRS HPP Trebinje I |
34. | TPP GACKO 1 x 300 MW |
B&H GACKO | 2000 - 2002 | Instalations system and testing; SCADA electrostatic precipitator |
EPRS TPP GACKO |
33. | EPCG S/S 110 kV Cvijetin brijeg |
EPCG PODGORICA | 2000 | 110 kV extention, delivery, mounting and testing | EPCG |
32. | Steel waterproof door in tunnel HPP Trebinje | B&H Republic of Srpska Trebišnjica | 1999 | Delivery and mounting of equipment | EPRS HPP on Trebišnjica |
31. | HPP VIŠEGRAD 3 x 115 MVA anti-corrosive protection |
B/H VIŠEGRAD | 1999 | Performing of works | EPRS HPP Višegrad |
30. | Power transformers and distribution substations
10(20) /0,4 kV 35/10 kV |
Bijeljina Pale Trebinje Banja Luka | 1999 | Delivery and mounting | EPRS |
29. | Distribution substations 10(20) /0,4 kV Power transformers 35/10 kV |
Bijeljina Pale Trebinje Banja Luka | 1999 | Delivery and mounting | EPRS |
28. | SIEMENS – NORWAY | Banja Luka | 1998 | Delivery of equipment 110 kV | NORWAY SIEMENS |
27. | HPP TREBINJE I water works energy supply |
B&H Republic of Srpska Bijeljina | 1998 | Installation and testing | EPRS HPP on Trebišnjici |
26. | Substation PS Lopare 110/10 kV |
B&H Republic of Srpska Lopare | 1998 | Delivery of equipment | EPRS |
25. | Substation Doboj | B&H Republic of Srpska Doboj | 1998 | Delivery of equipment 110 kV | EPRS HE na Trebišnjici |
24. | HPP Trebinje I | B&H Republic of Srpska TREBINJE | 1998 | Delivery of equipment | EPRS HPP on Trebišnjica |
23. | ALUMINKA ŠIPOVO | B&H Republic of Srpska Šipovo | 1997 | Feasibility study | Energoinvest ALUMINKA |
22. | HPP BOČAC 2 X 64 MVA |
B&H Republic of Srpska BOČAC | 1997 | Delivery of equipment 35 kV | EPRS HPP Bočac |
21. | Factory of storage battery SREBRENICA | B&H Republic of Srpska SREBRENICA | 1997 | Feasibility study | Energoinvest SREBRENICA |
20. | Substation BRČKO II/I 110/10 kV |
B&H Republic of Srpska BRČKO | 1997 | Delivery of equipment 110 kV and protection | EPRS |
19. | TERMOAPARATI „TAT“ | B&H Republic of Srpska IST. SARAJEVO | 1996 | Making of study and designing | Energoinvest |
18. | S/S GIS OBILIĆ 110 kV |
SERBIA BELGRADE | 1996 | Base project and delivery equipment | Elektrodistribucija BEOGRAD |
17. | TPP Gacko TS 400/110/35 kV |
B&H GACKO | 1993 - 1996 | Maitenance od substation 380/110/6/1 kV |
EPRS TPP GACKO |
16. | DV 132 kV | IRAQ | 1993 | Main design | Elektroprivreda Iraka |
15. | S/S 30/66 kV | Republic of Zaire | 1985-1990 | Main design and construction | S.N.E.L. |
14. | S/S 132/30/6.6 kV | Republic of Zaire | 1985-1990 | Main design and construction | S.N.E.L. |
13. | HE Mobayi, 5 x 5 MVA | Republic of Zaire Mobay | 1985-1990 | Main design and construction | S.N.E.L. |
12. | HPP Buk Bijela TS 400 kV GIS |
B&H FOČA | 1988 | Basic design | Elektroprivreda B&H |
11. | HPP Ulog 1 ×30 MVA |
B&H NEVESINJE | 1985 | Basic design | Elektroprivreda B&H |
10. | HPP Ljubuča 2 × 64 MVA |
B&H LJUBUČA | 1985 | Basic design | Elektroprivreda Bi&H |
9. | HPP Glavatičevo 3 × 64 + 10.5 MVA |
B&H GLAVATIČEVO | 1985 | Basic design | Elektroprivreda B&H |
8. | HPP Konjic 2 × 64 + 8,5 MVA |
B&H KONJIC | 1985 | Basic design | Elektroprivreda Bi&H |
7. | HPP Donkea 2 x 40 MVA |
Republic of Guinea | 1985 | Consulting regarding revitalization | Elektroprivreda GVINEJA KONAKRI |
6. | HPP Foča 3 x 20,5 MVA |
B&H FOČA | 1983 | Revision of basic design | Elektroprivreda B&H |
5. | HPP Mostar 3 × 30 MVA |
B&H MOSTAR | 1982-1986 | Main design and monitoring, erection and testing | Elektroprivreda B&H |
4. | HPP Bočac 2 x 64 MVA |
B&H BOČAC | 1978-1982 | Technical control of main design | Elektroprivreda B&H |
3. | HPP Grabovica 2 x 64 MVA |
B&H GRABOVICA | 1978-1982 | Main design and monitoring, erection and testing | Elektroprivreda B&H |
2. | HPP Trebinje II 1 х 10 MVA |
B&H TREBINJE | 1976-1978 | Main design and monitoring, erection and testing | Elektroprivreda B&H |
1. | SHPP ČAPLJINA 2 х 240 MVA |
B&H ČAPLJINA | 1974-1976 | Designing and monitoring | Elektroprivreda B&H |